BAKU, Azerbaijan, February 27. Italy accelerates
development of infrastructure for transit of Azerbaijani gasoline to
central European international locations, an article within the Italian Il Messaggero
(The Messanger) newspaper, one of many oldest and extensively learn within the
nation, Trend
stories.
According to the article, Italy intends to take away all
bottlenecks stopping gasoline from the southern a part of the nation to
be provided to the northern half.
Quoting Vannia Gava, Deputy Minister of the Environment and
Energy Security of Italy, the article famous that rising the
capability of the Trans Adriatic Pipeline (TAP) is among the fundamental
priorities for the federal government and have to be accelerated.
Thus, as famous within the article, Snam, one of many shareholders of
TAP, concluded the session course of on January 20. So, the
infrastructure for the rising volumes of provides from
Azerbaijan and plenty of North African international locations, because of giant
EU funding, is deliberate to be upgraded by 2026, and never by 2027, as
beforehand deliberate.
Meanwhile, Italy’s gasoline imports from Azerbaijan totaled
8.21 bcm in 2022, which is a rise of 34.3 p.c
year-on-year.
Designed for the potential to produce over 20 bcm of
gasoline, right now, TAP, the European part of the Southern Gas Corridor
(SGC), already ensures Italian vitality safety, protecting over 10
p.c of the nation’s gasoline demand, which is about 10 bcm.